Grace Bible Church – Easter Celebrations 2011

On Easter weekend, 22nd – 24th April 2011 Grace Bible Church had their anual Easter Celebrations at the Orlando Stadium.

We supplied the stage, a 13m x 10m with 10m uprights TFL ground support with a Stageplus 12m x 9m x 1.2m floor.

The PA we suplied was a total of 12 hangs of d&b audiotechnik, which included 40 J, 48 Q and 16 T series boxes, all powered by D12 amplifiers.

We had to cover the stadium in all directions so we did 2 hangs per corner and achieved full 360 degree coverage of the stadium.

Center fill per side consisted of four T – series boxes hung centrally on the roof structure.

The Subs were arrayed around the stage as well and consisted of J-Infra Subs, J- Subs and B2 Subs.